FPS by Flowco

Downhole Gauge Installation

Real-time downhole data gives you the power to optimize production, safeguard performance, and eliminate guesswork - one decision at a time.

What is Downhole Gauge Installation?

Downhole gauge installation is the deployment of specialized sensors into the wellbore to monitor real-time pressure and temperature data. This allows operators to optimize well performance, enhance reservoir understanding, and reduce costly downtime. With continuous, actionable data, you’re no longer reacting - you’re anticipating.
Make faster, smarter operational decisions
Prevent unplanned downtime with early warnings
Extend the life of your artificial lift systems
Identify reservoir trends to improve hydrocarbon recovery
Reduce interventions and associated OPEX
Optimize production across ESP, PCP, and gas lift systems
Schedule a Meeting to Optimize Your Mature Well ->
Dashboard mockup
How It Works

Understanding Gas Lift Valves

The Flowco Advantage: Why Choose Our Downhole Gauge Installation?

Simple, Versatile Installation

Tubing-conveyed or internal installations—no rig required for retrofits.

Real-Time Intelligence

Accurate, continuous data to drive every production decision.

Rugged and Reliable

Rated to 150°C / 302°F. Proven in the harshest well conditions worldwide.

Surface-Controlled Performance

Optional cloud-based monitoring and LiftMind™ integration services available.

Types of Downhole Gauge Installations

Installed via a carrier sub at the desired depth, this method is ideal for new completions or scheduled interventions.
  • Full annulus/tubing pressure monitoring
  • Permanent deployment
  • Integrated with LiftMind™ or SCADA
Installed internally to tubing without production string retrieval - ideal for brownfield optimization.
  • Fast retrofit installation
  • Minimal disruption to operations
  • Fully sealed and protected
Emerging wireless systems available for specific applications - ask your Flowco expert.
  • No cables or TEC line required
  • Ideal for wells with deployment limitations
  • Experimental use only

Case Study & Field Results

“Swapping to Flowco PPO valves extended run life by 2.5x on our high-temp South Texas wells. Zero dome failures, and our crews haven’t pulled tubing in over a year.”

- Major Oil & Gas Operator in the Permian Basin

Want to learn more?

Talk to one of our experts today to learn more or request a personalized quote for your operation.