“By implementing Flowco’s Conventional Plunger Lift, an operator in the Eagle Ford increased well uptime by 18% and reduced liquid loading events by 30% - all while lowering operational costs.”
Major Oil & Gas Operator, Production Engineer Case Study & Field Results